Documents provided by NZTA. Drawings of route are too large to archive here, but don't add a great deal. Key points:
Road shoulders 1.5 metres
No bridges to be widened or replaced, so will be pinch points
Cycle unfriendly roundabout at Moonshine Rd
Document Type:
Attachment | Size |
---|---|
Haywards SAR_Opt_4_FINAL_with RSA and Economic Peer Review_FULL REPORT.pdf | 9.36 MB |
SH58 Safety Audit Report_FINAL_SIGNED.pdf | 5.58 MB |